Electrical licensing by state
As of Nov. 4, 2026, across the 50 states and DC, electrical licenses renew every 1 to 4 years, most often every 2 years (19 of 44 with a statewide cycle). 32 set a continuing education (CE) requirement of 3 to 34 hours over the period each names, 6 have no CE requirement in their current rules, and 13 have no statewide figure in the sources checked. Illinois, Indiana, Kansas, New York and Pennsylvania have no statewide electrician license; where licensing exists, it is local. Rules change, so confirm with the licensing board before you renew.
Jump to a state: AL AK AZ AR CA CO CT DE DC FL GA HI ID IL IN IA KS KY LA ME MD MA MI MN MS MO MT NE NV NH NJ NM NY NC ND OH OK OR PA RI SC SD TN TX UT VT VA WA WV WI WY
Licensing by state
One row per state, alphabetical. CE hours are counted over the renewal cycle unless the row says otherwise. Each row lists the public pages it was checked against and when.
| State | Licensing authority | License types | Renewal | Continuing education | Sources |
|---|---|---|---|---|---|
| Alabama | Alabama State Board of Electrical Contractors (AECB) | Electrical contractor; Provisional electrical contractor; Journeyman electrician | Every year | No statewide CE requirement found in the current rules. All licenses renew every year. The board's CE rules apply only to licensed contractors, so journeyman electricians have no CE requirement. Electrical contractors and provisional electrical contractors need 14 hours every two years, in board-approved courses of at least two hours. Up to 7 hours may roll over. No CE is required in a contractor's first year. |
|
| Alaska | Alaska Department of Labor and Workforce Development, Mechanical Inspection | Electrician journeyman certificate of fitness; Residential wireman certificate of fitness; Power lineman certificate of fitness; Electrical administrator | Every 2 years | 16 hours every 2 years. Journeyman electricians need 16 hours in the 24 months before renewal. At least 8 hours must cover NEC changes and no more than 8 hours may be industry related. Electrical administrator licenses are issued by the Department of Commerce, Community, and Economic Development. Their CE rule was not confirmed. |
|
| Arizona | Arizona Registrar of Contractors (ROC) | C-11 Electrical contractor (commercial); R-11 Electrical contractor (residential); CR-11 Electrical contractor (dual) | Every 2 years | Arizona licenses electrical contractors, not individual electricians. Journeyman and master licenses are local where they exist. Contractor licenses renew every two years. No state CE rule for contractor renewal was confirmed. |
|
| Arkansas | Board of Electrical Examiners of the State of Arkansas, Arkansas Department of Labor and Licensing | Master electrician; Journeyman electrician; Residential master electrician; Residential journeyman electrician; Air conditioning electrician; Industrial maintenance electrician; Electrical apprentice registration | Every year | Licenses renew every year, but CE runs on the NEC cycle, not the renewal. Master and journeyman electricians need 8 hours on the NEC per NEC cycle. The cycle starts January 1 of each NEC publication year. Hours missing by the end of the first year of a new cycle block renewal. The rule names only master and journeyman licenses for CE. |
|
| California | California Department of Industrial Relations, Electrician Certification Unit | General electrician; Residential electrician; Fire/life safety technician; Voice data video technician; Nonresidential lighting technician; C-10 Electrical contractor | Every 3 years | 32 hours every 3 years. 32 hours every three years from an approved provider or apprenticeship program. Hours must relate to the certification type and can count toward more than one category. The C-10 contractor license is issued by the Contractors State License Board. |
|
| Colorado | Colorado State Electrical Board, Division of Professions and Occupations (DORA) | Master electrician; Journeyman electrician; Residential wireman; Electrical contractor | Every 3 years | 24 hours every 3 years. 24 hours each three-year license period for master, journeyman and residential wireman licenses. At least 4 hours must cover NEC changes. No more than 4 hours of safety courses count. Electricians first licensed by exam in the current period are exempt for that renewal. |
|
| Connecticut | Connecticut Department of Consumer Protection, Electrical Work Examining Board | E-1 Unlimited electrical contractor; E-2 Unlimited electrical journeyperson; Limited electrical contractor and journeyperson licenses (C, L, T and PV types) | Every year | 4 hours every year. Licenses expire every year. Electrical licensees take 4 hours of CE each year before renewal. The 2027 course covers state law, safety and 3 hours on the 2023 NEC. Limited license types take the same course with content for their scope. |
|
| Delaware | Delaware Division of Professional Regulation, Board of Electrical Examiners | Master electrician; Master electrician special; Limited electrician; Limited electrician special; Journeyperson; Apprentice | Every 2 years | 10 hours every 2 years. Licenses renew by June 30 of even years. Master, master special, limited and limited special licensees need 10 hours. From the second renewal, 5 of those hours must cover the NEC. Journeyperson, residential and apprentice licensees need 5 hours. Licensees in their first year need none. |
|
| District of Columbia | DC Department of Licensing and Consumer Protection, Board of Industrial Trades | Master electrician; Master electrician specialist; Journeyman electrician; Electrical apprentice; Special license in electrical maintenance and repair work | Every 2 years | All electrician licenses expire November 30 of odd years. CE hours for electricians could not be confirmed. The electrical licensing rules in DCMR 17 Chapter 2 show no CE section. |
|
| Florida | Florida Electrical Contractors' Licensing Board (DBPR) | Certified electrical contractor; Registered electrical contractor; Certified specialty electrical contractor; Registered specialty electrical contractor; Certified alarm system contractor I; Certified alarm system contractor II; Registered alarm system contractor I; Registered alarm system contractor II; Registered residential alarm system contractor | Every 2 years | 11 hours every 2 years. Licenses expire August 31 of even years. Electrical contractors need 11 hours: 1 each in workers compensation, workplace safety, business practices, Florida laws and rules and an advanced Florida Building Code module, plus 6 technical. Alarm and specialty contractors need 7 hours. Contractors doing alarm work also need 2 hours of false alarm prevention. Certified licenses are statewide. Registered licenses are valid only where the local registration is held. |
|
| Georgia | Georgia State Construction Industry Licensing Board, Division of Electrical Contractors | Electrical contractor Class I (restricted); Electrical contractor Class II (unrestricted) | Every 2 years | 8 hours every 2 years. 4 hours a year, 8 hours per two-year renewal. Licenses renew by June 30 of even years. Low voltage contractors are licensed by a separate division and have no CE requirement. The board pages block automated access, so these facts come from search excerpts of the board's own pages. |
|
| Hawaii | Hawaii Board of Electricians and Plumbers, DCCA Professional and Vocational Licensing | Journey worker electrician; Journey worker industrial electrician; Journey worker specialty electrician; Supervising electrician; Supervising industrial electrician; Supervising specialty electrician; Maintenance electrician | Every 3 years | Before each renewal, electricians except maintenance electricians must pass an approved course or a board exam on updates to the 2020 NEC. The required number of hours is not stated on the board page or in HRS 448E-8.5. Licenses issued within a year of renewal are exempt. All electrician licenses renew by June 30 every three years. |
|
| Idaho | Idaho Electrical Board, Division of Occupational and Professional Licenses (DOPL) | Master electrician; Journeyman electrician; Provisional journeyman electrician; Electrical contractor; Limited electrical contractor; Limited electrical installer | Every 3 years | No statewide CE requirement found in the current rules. The current Electrical Board rules have no CE section. The 2024 temporary rule had required 24 hours per three-year cycle, and stakeholders asked in July 2026 for CE to be restored. Journeyman and master licenses run three years. Contractor licenses run one year. DOPL is moving the board to two-year licensing. |
|
| Illinois | Local municipalities (no state electrical licensing body) | None statewide in the sources checked | Not found in the sources checked | No statewide electrical license. Municipalities may set up an electrical commission and examine and license electricians under 65 ILCS 5/11-37. CE and renewal rules are set locally. |
|
| Indiana | Indiana Fire Prevention and Building Safety Commission (Indiana Department of Homeland Security) | None statewide in the sources checked | Not found in the sources checked | No statewide electrical license. Electricians and electrical contractors are licensed by cities and counties, with local CE and renewal rules. The state commission adopts the electrical code only. |
|
| Iowa | Iowa Department of Inspections, Appeals and Licensing (DIAL), Electrical Examining Board | Electrical contractor; Residential electrical contractor; Class A master electrician; Class B master electrician; Class A journeyman electrician; Class B journeyman electrician; Residential master electrician; Residential electrician; Special electrician | Every 3 years | 18 hours every 3 years. 18 contact hours of board approved courses in each 3 year license period for master and journeyman licenses. At least 6 hours must study the NEC. Hours are prorated for licenses issued for less than 3 years. Hours do not carry over to the next cycle. |
|
| Kansas | Local city and county governments (no state electrical licensing body) | None statewide in the sources checked | Not found in the sources checked | No statewide electrical license. Cities and counties that license electricians must require at least 12 hours of CE every 2 years or 6 hours a year, with at least half on the code, under K.S.A. 12-1526. A local license is valid only in the jurisdiction that issued it. A 2026 bill for statewide licensing by the State Fire Marshal (HB 2588) died. |
|
| Kentucky | Kentucky Department of Housing, Buildings and Construction (DHBC) | Electrical contractor; Master electrician; Electrician | Every 2 years | 6 hours every 2 years. Licenses are valid for two years and renew by the end of the licensee's birth month. The CE rule requires 6 hours before renewal, taken in the 12 months before it. That rule still says annual and predates the May 2025 move to two-year licenses, so confirm with DHBC. Master electrician and electrician CE covers codes, job safety or the electrical trade. Contractor CE covers business or job safety. Electrical inspectors need 12 hours. |
|
| Louisiana | Louisiana State Licensing Board for Contractors (LSLBC) | Commercial electrical contractor classification | Not found in the sources checked | No statewide CE requirement found in the current rules. LSLBC licenses electrical contracting businesses through a commercial license with an electrical classification. No statewide journeyman or master electrician license was found on the board's pages. The board requires no CE for commercial licenses. Licensees choose a one, two or three year term at each renewal. |
|
| Maine | Maine Electricians' Examining Board | Master electrician; Journeyman electrician; Limited electrician; Journeyman-in-training electrician; Apprentice electrician; Helper electrician | Every 2 years | 15 hours every 2 years. Masters and journeymen take a 15 hour course on the current NEC as adopted by the Board. The Board's code update schedule follows the three year NEC cycle, so the course is tied to each new code edition. CE for limited licenses was not confirmed. |
|
| Maryland | Maryland State Board of Electricians | Master electrician; Journeyperson electrician; Apprentice electrician | Every 2 years | 10 hours every 2 years. Masters need 10 hours per renewal and journeypersons need 5 hours. Hours must be earned in the 24 months before renewal. No apprentice CE requirement was found in the rule. |
|
| Massachusetts | Massachusetts Board of State Examiners of Electricians | Master electrician (Class A); Journeyman electrician (Class B); Systems contractor (Class C); Systems technician (Class D) | Every 3 years | 21 hours every 3 years. 21 hours in the three years before renewal. 15 hours cover the Massachusetts Electrical Code and 6 hours are professional development chosen by the licensee. Courses must be from Board approved providers. Systems licensees take courses approved for their class. |
|
| Michigan | Michigan Department of Licensing and Regulatory Affairs, Bureau of Construction Codes (LARA BCC) | Master electrician; Electrical journeyman; Fire alarm specialty technician; Sign specialist; Electrical contractor; Fire alarm contractor; Sign specialty contractor | Every year | Master and journeyman licenses renew every year by December 31. There is no yearly CE. A board approved code update course is required within one year after Michigan adopts a new code. The state pages read here do not give the hour count for that course. Contractor licenses renew every three years. Apprentices register every year and must be in related technical instruction instead of a code update course. |
|
| Minnesota | Minnesota Department of Labor and Industry (DLI) and Board of Electricity | Class A master electrician; Class B master electrician; Class A journeyworker electrician; Class B journeyworker electrician; Class A installer; Class B installer; Maintenance electrician; Power limited technician; Satellite system installer; Lineman; Class A electrical contractor; Class B electrical contractor; Technology systems contractor; Satellite system contractor | Every 2 years | 16 hours every 2 years. Master, journeyworker, maintenance electrician and Class B installer licenses need 16 hours per two year term, with 12 hours on the code and 4 on other topics. Power limited technicians need 16 hours with 4 on the code. Linemen need none. Masters have no CE in the first year of the license. Master licenses expire March 1 of odd years. Other personal licenses expire two years from issue. Unlicensed registrants need 2 hours each year. Extra hours do not carry over. |
|
| Mississippi | Mississippi State Board of Contractors | Commercial contractor, Electrical classification; Residential Electrical contractor | Every year | There is no statewide journeyman or master electrician license. The Board licenses electrical contractors and they renew every year. Residential license qualifiers need 2 hours of CE. The interval and any commercial CE rule were not confirmed. |
|
| Missouri | Missouri Division of Professional Registration, Office of Statewide Electrical Contractors | Statewide electrical contractor (optional) | Every 3 years | No statewide CE requirement found in the current rules. The statewide electrical contractor license is optional. It lets the holder work and pull permits in any city or county. Journeyman, master and contractor licenses for local work are issued by cities and counties. The statewide license renews every three years by September 30. The renewal rule asks only for the form and fees. The law allows CE rules, but none were found. |
|
| Montana | Montana Department of Labor and Industry, State Electrical Board | Master electrician; Journeyman electrician; Residential electrician; Electrical contractor | Every 2 years | 16 hours every 2 years. 16 hours per renewal cycle under ARM 24.141.2102, which is 8 hours for each year of the cycle. At least 4 of each 8 annual hours must cover NEC updates. Applies to master, journeyman and residential electricians. The 2 year cycle is read from the board's 8 hours a year and 16 hour figures and its 2026 renewal window (May 15 to July 15). |
|
| Nebraska | Nebraska State Electrical Division and State Electrical Board | Electrical contractor; Class B electrical contractor; Class A master electrician; Journeyman electrician; Class B journeyman electrician; Residential journeyman electrician; Special electrician; Fire alarm installer | Every 2 years | 12 hours every 2 years. 12 hours per two year cycle, with at least 6 on the NEC. Hours are due by January 1 of each odd year. All licenses and apprentice registrations expire December 31 of even years. Apprentices do not need CE. |
|
| Nevada | Nevada State Contractors Board (NSCB) | C-2 Electrical contractor | Not found in the sources checked | No statewide individual electrician license. Journeyman and master cards, where required, are issued locally. The NSCB licenses electrical contractors in classification C-2 and its subclassifications. A contractor license expires 2 years after issue under NRS 624.283. No CE requirement for contractor renewal was found in NRS 624. |
|
| New Hampshire | New Hampshire Electricians' Board (Office of Professional Licensure and Certification) | Master electrician; Journeyman electrician; High/medium voltage electrician; Electrical corporation or partnership; Apprentice (identification card) | Every 2 years | 15 hours every 2 years. Masters and journeymen need 15 hours on changes in the latest NEC, with at least 1 hour on RSA 319-C, Board rules and New Hampshire concerns. The hours are due within 12 months from January 1 after each new NEC edition, so they come once per code cycle rather than every renewal. Apprentices have separate rules. | Checked Nov. 4, 2026 |
| New Jersey | New Jersey Board of Examiners of Electrical Contractors | Electrical contractor; Electrical business permit; Qualified journeyman electrician (registration) | Every 3 years | 34 hours every 3 years. Licensed electrical contractors need 34 hours per triennial period. That includes a 10 hour in person course with 9 hours on the latest NEC and 1 hour on New Jersey law and rules. Up to 8 hours may come from OSHA authorized online safety courses. Qualified journeyman electricians have a separate, smaller triennial requirement under N.J.A.C. 13:31-5.5. |
|
| New Mexico | New Mexico Regulation and Licensing Department, Construction Industries Division (CID) | Electrical contractor; Journeyman electrician; Journeyman lineman | Every 3 years | 16 hours every 3 years. Journeyman electrician certificates need 16 hours in each 3 year period. 8 hours are code change instruction and 8 hours are other industry related instruction. CE rules for contractor qualifying parties were not confirmed. |
|
| New York | New York Department of State, Division of Building Standards and Codes | None statewide in the sources checked | Not found in the sources checked | New York has no statewide electrician license. Cities and counties such as New York City, Buffalo, Westchester and Suffolk license electricians locally, each with its own rules. |
|
| North Carolina | North Carolina State Board of Examiners of Electrical Contractors | Limited; Intermediate; Unlimited; SP-SFD Residential dwelling; SP-FA/LV Fire alarm and low voltage; SP-PH Plumbing, heating and air conditioning; SP-SP Swimming pool; SP-WP Groundwater pump; SP-ES Electric sign; SP-EL Elevator | Every year | 8 hours every year. Licenses renew every year. Limited, Intermediate, Unlimited and SFD qualifiers need 8 hours a year. Other special restricted qualifiers need 4 hours. At least half the hours must be classroom. | Checked Nov. 4, 2026 |
| North Dakota | North Dakota State Electrical Board (NDSEB) | Master electrician; Journeyman electrician; Class B electrician; Power limited electrician | Every year | 8 hours every 2 years. Licenses renew every year. Master, Class B and power limited licenses expire April 30. Journeyman licenses expire March 31. State law requires at least 8 hours each two year period, and the board requires 8 hours, 4 of them on the code, on file to renew. The 8 hours cover two yearly renewals, not one. |
|
| Ohio | Ohio Construction Industry Licensing Board (OCILB) | Electrical contractor | Every year | 10 hours every year. Ohio has no state journeyman or master license. OCILB licenses the electrical contractor through a qualifying individual. Some cities license electricians locally. The license renews every year with 10 hours of approved CE, at least 5 on the electrical code. A licensee with other OCILB licenses takes 5 code hours and 5 hours from any section. |
|
| Oklahoma | Oklahoma Construction Industries Board (CIB), Committee of Electrical Examiners | Electrical contractor; Journeyman electrician | Every year | 12 hours every 3 years. Licenses run one year and expire on the last day of the holder's birth month. From 2026-01-01, contractors and journeymen need 12 hours every three years to renew, not every year. Six hours must cover the codes adopted by the OUBCC. The other six may cover approved electrical topics. Apprentices register yearly and need 3 hours a year unless in an approved course. |
|
| Oregon | Oregon Building Codes Division (BCD), Electrical and Elevator Board | General supervising electrician; Limited supervising electrician; General journeyman electrician; Limited residential electrician; Limited maintenance electrician; Limited energy technician; Limited renewable energy technician; Electrical contractor | Every 3 years | 24 hours every 3 years. General journeyman electricians need 24 hours per three-year cycle, with 8 hours of code change and a 4-hour Oregon rules and law course. Supervising electricians also need 24 hours, with 12 hours of code change. Some limited licenses need fewer hours. Several limited licenses are exempt. The rule text was read on a public mirror of the Oregon Administrative Rules. |
|
| Pennsylvania | Pennsylvania Department of Labor and Industry, Uniform Construction Code | None statewide in the sources checked | Not found in the sources checked | Pennsylvania has no statewide electrician license. Some cities, such as Philadelphia and Pittsburgh, license electricians locally. |
|
| Rhode Island | Rhode Island Board of Examiners of Electricians (Department of Labor and Training) | Electrical contractor (A); Journeyperson electrician (B); Limited premises (C); Limited maintenance (D); Limited maintenance journeyperson (M); Fire alarm contractor (AF); Fire alarm installer (BF); Electrical sign contractor (SCF); Electrical sign installer (CF); Lightning protection contractor (LPC); Lightning protection installer (LPI); Sign renovation electrical (SRL) | Every 2 years | 15 hours every 2 years. Class A and Class B electricians need at least 15 hours per renewal. Courses cover the currently adopted NEC and related codes. The requirement does not apply to other classes. |
|
| South Carolina | South Carolina Department of Labor, Licensing and Regulation (Contractor's Licensing Board and Residential Builders Commission) | Mechanical contractor, Electrical classification; Residential electrician | Every 2 years | Commercial electrical work over $10,000 needs a Mechanical Contractor license with the Electrical classification. Those licenses expire October 31 of odd years. Residential electrical work over $500 needs a Residential Electrician license. Its renewal cycle was not confirmed. The board pages list no CE rule, so CE hours are not confirmed. |
|
| South Dakota | South Dakota State Electrical Commission, Department of Labor and Regulation | Electrical contractor; Journeyman electrician; Class B electrician; 501(d) electrician | Every 2 years | 16 hours every 2 years. Licenses run two years and expire June 30 of even years. 16 hours are due by renewal or June 30, whichever is sooner. At least 8 hours must be on the NEC. No more than 8 hours may be correspondence or online. The commission page does not list different hours by class. |
|
| Tennessee | Tennessee Board for Licensing Contractors | Contractor license, CE electrical classification; Limited Licensed Electrician (LLE) | Every 2 years | No statewide CE requirement found in the current rules. There is no statewide journeyman or master license. The LLE is the individual license and it renews every two years. Contractors also renew every two years. The Board requires CE only for BC-A building contractors, not for electrical licenses. |
|
| Texas | Texas Department of Licensing and Regulation (TDLR) | Master electrician; Journeyman electrician; Journeyman industrial electrician; Journeyman lineman; Residential wireman; Maintenance electrician; Master sign electrician; Journeyman sign electrician; Apprentice electrician; Apprentice sign electrician; Residential appliance installer; Electrical contractor; Electrical sign contractor; Residential appliance installation contractor | Every year | 4 hours every year. 4 hours each one-year license term, covering the NEC, Texas electrician law, TDLR rules and NFPA 70E safety. Anyone who takes 4 hours on the NEC alone must add at least 1 hour on law, rules or safety. Apprentices may instead be enrolled in a registered apprenticeship course. Contractors and residential appliance installers need no CE. |
|
| Utah | Utah Division of Professional Licensing (DOPL) | Master electrician; Residential master electrician; Journeyman electrician; Residential journeyman electrician; Apprentice electrician | Every 2 years | 16 hours every 2 years. 16 hours per 2 year term under Utah Admin. Code R156-55b-304. 12 hours must be core, with 8 hours on the NEC and 4 hours on NFPA 70E. Licenses expire November 30 of even years. Differences for apprentices were not confirmed. |
|
| Vermont | Vermont Electricians Licensing Board (Division of Fire Safety) | Master electrician; Journeyman electrician; Type S journeyman (specialty) | Every 3 years | 15 hours every 3 years. Masters and journeymen need 15 hours on the NEC in the 36 months before renewal. Type S holders need 8 hours on their specialty, capped at 15 hours for multiple Type S licenses. Renewal also requires a short state energy goals module. The statute was read on a secondary site because the state legislature site could not be reached. |
|
| Virginia | Virginia Department of Professional and Occupational Regulation, Board for Contractors (Tradesman program) | Master electrician; Journeyman electrician; Electrical contractor (Class A, B or C with ELE specialty) | Every 2 years | 3 hours every 2 years. Tradesman licenses run two years. Journeyman and master electricians take one 3-hour course on the NEC each term from a Board-approved provider. Holders of both licenses take only one course. |
|
| Washington | Washington State Department of Labor and Industries (L&I), Electrical Program | Journey level electrician; Specialty electrician; Master electrician; Electrical administrator; Electrical contractor; Electrical trainee | Every 3 years | 24 hours every 3 years. 24 hours every three years for electricians, master electricians and administrators. This includes 8 hours on NEC changes and 4 hours on RCW 19.28 and WAC 296-46B. Trainees instead need 48 hours of classroom instruction every two years. |
|
| West Virginia | West Virginia State Fire Marshal's Office | Master electrician; Journeyman electrician; Specialty electrician (SP-PH, SP-ES, SP-SFD, SP-LV, SP-EL) | Every year | No statewide CE requirement found in the current rules. Electrician licenses expire June 30 each year. They may be renewed for one year or up to three years. The renewal rule lists no CE requirement. |
|
| Wisconsin | Wisconsin Department of Safety and Professional Services (DSPS) | Master electrician; Residential master electrician; Registered master electrician; Journeyman electrician; Industrial journeyman electrician; Residential journeyman electrician; Registered electrician; Electrical apprentice; Industrial electrical apprentice; Residential electrical apprentice; Electrical contractor | Every 4 years | 24 hours every 4 years. Master and journeyman electrician licenses run four years, expiring June 30, and need 24 hours per renewal. Residential master, residential journeyman and industrial journeyman licenses need 18 hours. Registered electricians renew every year with 24 hours. Registered master electrician registrations are permanent. The electrical contractor license also runs four years. |
|
| Wyoming | Wyoming Department of Fire Prevention and Electrical Safety, Electrical Board | Master electrician; Journeyman electrician; Low voltage technician; Limited technician; Apprentice electrician; Electrical contractor; Low voltage electrical contractor; Limited electrical contractor | Every 3 years | 16 hours every 3 years. 16 hours per 3 year license period for master and journeyman electricians, with at least 8 hours on NEC changes. The hours and cycle come from a secondary source (IAEI) because the state CE page only links to rule documents that could not be read. CE for low voltage and limited technicians was not confirmed. |
|
About this data
Each row is checked against public pages, mostly the state's own statutes, rules and licensing board pages, and links them. We record statewide licenses only; where a state leaves licensing to cities and counties, the row says so. Each state is re-checked on a monthly regional rotation. The NEC edition each state enforces is on NEC adoption by state. Read who runs EstimatorBench.
Data license: CC BY 4.0. Reuse it with credit to EstimatorBench, a link to this page and to the license, and a note if you changed anything. About the data license.